Scroll

Purpose Built

Watch the Film
Purpose-built
Overview
Stats

160K SF

new laboratory construction

15,522 SF

available on the 3rd floor

Q4 2022

occupancy of available 3rd floor space

Lobby photo at 101 CPD

Take The
Tour VR Tour special cursor

Connected to Everything
01 Cambridgepark’s Alewife location
Stats

2 Min

walk to Alewife
Red Line Station

7 Min

to Harvard University
via the Red Line

20 Min

drive to Downtown Boston

30+

miles of bike trails

40+

life science neighbors

450K SF

Cambridgepark campus under common ownership

Points of Interest

  • Access
  • Local Amenities
  • Fitness & Recreation
  • Ingress/Egress
  • Residential
  • Eateries
  • Campus under common ownership
North arrow icon
Fuel Your Most Ambitious Pursuits
Amenities
Amenity highlights
On-site Blue Bike station

On-site Blue
Bike station

Indoor bicycle storage and repair room

Indoor bicycle storage and repair room

Courtyard with outdoor seating

Courtyard with
outdoor seating

Parking garage with up to 1 space per 1,000 SF

Parking garage with up to 1 space per 1,000 SF

On-site retail proposed at street level

On-site retail proposed at street level

Flexible gathering space adjacent to the lobby

Flexible gathering space adjacent to the lobby

Floor Plans

Availability

P 1 2 3 4 5